|
Wall complete.. view from dining/living room....................
Submitted by: chizelz on 2005-06-03 Views: 1601 | Comments: 4
|
|
Wall is complete and the first few routes are up. View from Main Floor.
Submitted by: chizelz on 2004-07-21 Views: 1449 | Comments: 0
|
|
Wall is complete and the first few routes are up. View from Second Floor.
Submitted by: chizelz on 2004-07-21 Views: 1628 | Vote: 1 | Comments: 0
|
|
Wall is complete and the first few routes are up. View from Third Floor.
Submitted by: chizelz on 2004-07-21 Views: 894 | Comments: 2
|
|
View 2 of 2 of a batch of home-made climbing holds, these are the raw, just out of the mold forms, they still have to be touched up and sanded.
Submitted by: chizelz on 2004-06-14 Views: 2713 | Comments: 3
|
|
Molds, made by squeezing a tube or two of 100% pure silicone over planters foam.
Submitted by: chizelz on 2004-06-14 Views: 1883 | Comments: 0
|
|
View 1 of 2 of a batch of home-made climbing holds, these are the raw, just out of the mold forms, they still have to be touched up and sanded.
Submitted by: chizelz on 2004-06-14 Views: 1995 | Comments: 0
|
|
Molds, made by squeezing a tube or two of 100% pure silicone over planters foam. View from the back of the mold.
Submitted by: chizelz on 2004-06-14 Views: 1638 | Comments: 0
|
|
wall painfully close to completion, view from second floor
Submitted by: chizelz on 2004-05-02 Views: 1039 | Comments: 2
|
|
Wall painfully close to completion, view from main floor.
Submitted by: chizelz on 2004-05-02 Views: 1203 | Comments: 0
|
|
wall painfully close to completion, view from third floor
Submitted by: chizelz on 2004-05-02 Views: 1088 | Comments: 0
|
|
view of future climbing wall location from mezzanine across three storey open space. Lead and top rope anchors installed, panels ready to go.
Submitted by: chizelz on 2004-04-25 Views: 1120 | Comments: 0
|
|
view from playroom, with the first 3 panels up. Wood on the floor in front of the wall is for roof parapets, and is not part of the wall.
Submitted by: chizelz on 2004-04-25 Views: 672 | Comments: 0
|
|
finally the first three panels of the wall are up, 3 more to go.... its going to be awfully hard to finish the rest of the house now... too much climbing to do...
Submitted by: chizelz on 2004-04-25 Views: 1036 | Comments: 0
|
|
This is the future location of my home climbing wall. This is a portion of my house, currently under construction. The Climbing Wall portion will be on teh right hand side of the picture between the steel door and the leading edge of the mezzanine of the floor above. The wall will be a straight vertical wall 26+ feet high. The planking that spans to the beams is temporary for construction, and upon completion shall be removed.
Submitted by: chizelz on 2004-04-12 Views: 2750 | Comment: 1
|
|
a plywood hangboard I made a few moons ago, by laminating plywood panels together and drilling holes in them, then sandin'er down.
Submitted by: chizelz on 2004-03-21 Views: 907 | Comments: 0
|