Routes : Reviews
twdirty's Logbook (109 ascents)
Climbing Log | Hit List (0)
|
Comments: Show | Hide
Date | Level | Difficulty | Route | Rating |
---|---|---|---|---|
2010-10-18 | Onsight | 5.7 | Columbian Crack | |
2010-10-18 | Onsight | 5.9 | Just Say No | |
2010-10-18 | Onsight | 5.8 | Rye Crisp | |
2010-10-18 | Onsight | 5.10a | The Pygmies Got Stoned | |
2010-10-18 | Onsight | 5.7 | Wheat Thin | |
2010-10-18 | Onsight | 5.8 | twist and crawl | |
2010-10-18 | Onsight | 5.10a | Bloody Fingers | |
2010-10-18 | Onsight | 5.8 | skyline | |
2010-10-18 | Onsight | 5.8 | Delay of Game | |
2010-10-14 | Onsight | 5.9 | Scream Cheese | |
2010-10-13 | Onsight | 5.7 | Intruding Dike | |
2010-10-12 | Onsight | 5.11a | Kibbles and Bits | |
2010-10-11 | Onsight | 5.11a | Dimples and Tits | |
2010-10-11 | Onsight | 5.10a | Nipples & Clits | |
2010-10-11 | Onsight | 5.8 | carol's crack | |
2010-10-11 | Onsight | 5.7 | Adolescent Homosapien | |
2010-10-11 | Onsight | 5.8 | unnamed 5.8 | |
2010-08-27 | Onsight | 5.9 | Outer Space | |
2010-07-11 | Onsight | 5.11a | Sisyphus | |
2010-05-23 | Onsight | 5.9 | Ride 'Em Cowboy | |
2009-10-16 | Onsight | 5.8 | Owl Rock | |
2009-10-16 | Onsight | 5.10c | Variation | |
2009-10-15 | Onsight | 5.8 | Tonka Tower | |
2009-10-15 | Onsight | 5.8 | Ancient Art | |
2009-10-14 | Onsight | 5.9 | Kor-Ingalls | |
2009-10-10 | Onsight | 5.7 | Hatchet Crack | |
2009-10-09 | Onsight | 5.7 | Crescent Crack | |
2009-10-09 | Onsight | 5.9 | Final Link | |
2009-07-30 | Onsight | 5.7 | Lieback Crack | |
2009-07-30 | Onsight | |||
2009-07-29 | Onsight | 5.8 | Diedre | |
2009-07-28 | Onsight | 5.7 | Corner Crack | |
2009-07-28 | Onsight | 5.6 | Corn Flakes | |
2009-07-28 | Second | 5.10a | Flying Circus | |
2009-07-28 | Top Rope | 5.9 | Clandestine Affair | |
2009-07-28 | Second | 5.9 | Penny Lane | |
2009-07-28 | Onsight | 5.8 | Quarryman | |
2009-06-09 | Onsight | 5.8 | Southwest Rib | |
2009-02-15 | Onsight | 5.3 | The Eye | |
2008-11-02 | Onsight | 5.7 | Mental Physics | |
2008-11-02 | Top Rope | 5.9 | Dazed and Confused | |
2008-11-02 | Top Rope | 5.9 | Hand Wobler Delight | |
2008-11-01 | Top Rope | 5.8 | W.A.C. | |
2008-08-30 | Onsight | 5.10a | East Face | |
2008-08-24 | Red Point | 5.10b | steppenruf | |
2008-08-24 | Onsight | 5.7 | wide lode | |
2008-07-30 | Onsight | 5.10a | Point Man | |
2008-07-11 | Onsight | 5.6 | Beckey Route | |
2008-07-08 | Hang Dog | 5.11a | Double take/Dos Roof | |
2008-07-08 | Onsight | 5.8 | drive by nose job |