Forums: Climbing Information: The Lab: Re: [acorneau] Purcell Prusik: Edit Log




bill413


Jul 19, 2009, 3:00 PM

Views: 23329

Registered: Oct 19, 2004
Posts: 5674

Re: [acorneau] Purcell Prusik
Report this Post
Average: avg_1 avg_2 avg_3 avg_4 avg_5 (0 ratings)  

acorneau wrote:
shu2kill wrote:
so now you are tied in to two points, without the need of extra gear.

however, i have another question. you climb to the top of a multipitch route, and now you have to rappel down. how do you tie in to the anchors to pull the rope to set it at the rap station for the next pitch down??

or does this clove hitching thing only works in single pitch routes??

Well, I only came up with this idea just yesterday so I hadn't thought through all scenarios. For raps I would use a separate system (Purcell, slings, etc).

Let's see - I'm a bit foggy on the previous discussion on this thread, so I don't remember the constraints on our situation, but...
With minimal extra gear, bolted anchor:

Tie into system as acorneau has suggested. Pull up rope so you now have both ends. end of rope through chains. Pull both ends of rope through your hands so that you wind up with the middle point of the rope hanging through the chains. Rig your rappel device. Double check the rigging of your rappel device. Untie one the clove hitches from the chains. Check your rappel device. Untie the 5 foot tail. Rap down (you can keep the end of the rope still tied to you while doing this). Tie into next anchor. Repeat.

Sigh - I'll try to bring up some extra gear with me next time...It'll make it easier.


(This post was edited by bill413 on Jul 19, 2009, 6:11 PM)



Edit Log:
Post edited by bill413 () on Jul 19, 2009, 6:11 PM


Search for (options)

Log In:

Username:
Password: Remember me:

Go Register
Go Lost Password?