A thread in another forum brought this up so I thought I'd post it here: "An Examination of Purcell Prusiks as Personal Restraint Lanyards" http://www.marski.org/...gid=74&Itemid=26
|
|
|
|
|
majid_sabet
Oct 21, 2008, 4:54 AM
Post #2 of 47
(63828 views)
Shortcut
Registered: Dec 13, 2002
Posts: 8390
|
|
|
|
|
|
jeepnphreak
Oct 21, 2008, 3:17 PM
Post #3 of 47
(63691 views)
Shortcut
Registered: Jul 29, 2008
Posts: 1259
|
I used one of those instead of a daisy chain. I use 7mm dynamic cord to limit the shock load on my system. plus it adjustable.
|
|
|
|
|
binrat
Oct 22, 2008, 12:05 AM
Post #4 of 47
(63577 views)
Shortcut
Registered: Jul 27, 2006
Posts: 1155
|
I have been using one for about 10 years now. binrat
|
|
|
|
|
shockabuku
Oct 22, 2008, 4:42 AM
Post #5 of 47
(63518 views)
Shortcut
Registered: May 20, 2006
Posts: 4868
|
Interesting article. The concluding comments about not using high performance low stretch materials for a lanyard at the end of the text seemed out of place however. I did see the following data but no analysis of it was presented or even mention made of the data in the article body.
|
|
|
|
|
MudBuzz
Apr 28, 2009, 10:27 PM
Post #6 of 47
(62641 views)
Shortcut
Registered: Mar 9, 2009
Posts: 15
|
So I notice there's a single loop on one end to connect to harness, and two loops on the other end with one biner to anchor. Can you put a biner on each loop to clip two anchors?
|
|
|
|
|
acorneau
Apr 29, 2009, 1:24 AM
Post #7 of 47
(62529 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
MudBuzz wrote: So I notice there's a single loop on one end to connect to harness, and two loops on the other end with one biner to anchor. Can you put a biner on each loop to clip two anchors? Well, you could, but I don't think anyone has tested it that way. My guess is that if you were off to one side, loading one loop and not the other, that the holding power of the prussic would be severely reduced. But wait, this is the Lab... Aric, to the Batmobile (I mean, pull tester)!!!
|
|
|
|
|
Rudmin
Apr 29, 2009, 3:36 PM
Post #8 of 47
(62438 views)
Shortcut
Registered: Mar 29, 2009
Posts: 606
|
Is there a good reason not to save a biner and girth hitch the whole thing to the tie in points?
|
|
|
|
|
acorneau
Apr 29, 2009, 4:04 PM
Post #9 of 47
(62442 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
Rudmin wrote: Is there a good reason not to save a biner and girth hitch the whole thing to the tie in points? I'd highly recommend a direct girth hitch and not using a biner. Maybe the people in Majid's picture are using a biner for a particular reason... Majid?
|
|
|
|
|
majid_sabet
Apr 29, 2009, 4:36 PM
Post #10 of 47
(62396 views)
Shortcut
Registered: Dec 13, 2002
Posts: 8390
|
acorneau wrote: Rudmin wrote: Is there a good reason not to save a biner and girth hitch the whole thing to the tie in points? I'd highly recommend a direct girth hitch and not using a biner. Maybe the people in Majid's picture are using a biner for a particular reason... Majid? what do you mean direct girth hitch to harness ?
|
|
|
|
|
d0nk3yk0n9
Apr 29, 2009, 7:52 PM
Post #11 of 47
(62350 views)
Shortcut
Registered: Jan 22, 2009
Posts: 182
|
majid_sabet wrote: acorneau wrote: Rudmin wrote: Is there a good reason not to save a biner and girth hitch the whole thing to the tie in points? I'd highly recommend a direct girth hitch and not using a biner. Maybe the people in Majid's picture are using a biner for a particular reason... Majid? what do you mean direct girth hitch to harness ? I think he means girth hitching the loop created by the figure 8 on a bight directly to your belay loop instead of using a biner to attach this loop to your belay loop.
|
|
|
|
|
majid_sabet
Apr 30, 2009, 5:13 AM
Post #12 of 47
(62223 views)
Shortcut
Registered: Dec 13, 2002
Posts: 8390
|
d0nk3yk0n9 wrote: majid_sabet wrote: acorneau wrote: Rudmin wrote: Is there a good reason not to save a biner and girth hitch the whole thing to the tie in points? I'd highly recommend a direct girth hitch and not using a biner. Maybe the people in Majid's picture are using a biner for a particular reason... Majid? what do you mean direct girth hitch to harness ? I think he means girth hitching the loop created by the figure 8 on a bight directly to your belay loop instead of using a biner to attach this loop to your belay loop. you can go direct to belay loop and that is ok but in many rescue applications we use the Purcell and biner for easy connect/disconnect.
|
|
|
|
|
getsomeethics
Apr 30, 2009, 11:13 PM
Post #13 of 47
(62065 views)
Shortcut
Registered: May 2, 2002
Posts: 313
|
I saw the Pucell Prusik on here somewhere else a couple years ago and have been using it ever since. I girth hitch it to my harness and have it such a length that when it is fully extended i can still reach the prusik to re-adjust. Wish i knew about it years ago.
|
|
|
|
|
Adk
Apr 30, 2009, 11:29 PM
Post #14 of 47
(62027 views)
Shortcut
Registered: Dec 2, 2006
Posts: 1085
|
I've seen this before but really never gave it any thought. How much cord might one need to make the purcell? I'm beginning to like my thoughts here.
|
|
|
|
|
acorneau
May 1, 2009, 12:22 AM
Post #15 of 47
(62014 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
Adk wrote: I've seen this before but really never gave it any thought. How much cord might one need to make the purcell? I'm beginning to like my thoughts here. I want to say about 12' of 6mm cord will be just about right. If you want it longer, then maybe 13' or 14'.
|
|
|
|
|
Adk
May 1, 2009, 2:53 AM
Post #16 of 47
(61955 views)
Shortcut
Registered: Dec 2, 2006
Posts: 1085
|
Thanks man. It's much appreciated.
|
|
|
|
|
acorneau
May 7, 2009, 10:08 PM
Post #17 of 47
(61729 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
MudBuzz wrote: So I notice there's a single loop on one end to connect to harness, and two loops on the other end with one biner to anchor. Can you put a biner on each loop to clip two anchors? So I tried this at the gym yesterday. What I found out is that yes, it seems to hold just fine while clipped to two horizontal hangers and as long as you're in the middle. However, I tried offsetting one loop (pulling one stand tighter than the other) as if you were hanging to the side of the anchors. When you weight the Purcell it will slip until both loops are weighted equally. A pull test and/or drop test on the split-loop configuration would be enlightening.
|
|
|
|
|
ja1484
May 7, 2009, 10:40 PM
Post #18 of 47
(61708 views)
Shortcut
Registered: Aug 11, 2006
Posts: 1935
|
Best. Personal. Tether. Ever. Made the switch to 'em two years ago and haven't looked back since. They really shine on rappel. Being able to lengthen them under load is a huge plus. Oh, and fuck 'biners or girth hitches, just tie the damn thing direct into your tie-in points - it cuts down on clutter around the tie-ins and requires less cord. Replace as needed.
(This post was edited by ja1484 on May 8, 2009, 2:52 AM)
|
|
|
|
|
d0nk3yk0n9
May 8, 2009, 1:12 AM
Post #19 of 47
(61662 views)
Shortcut
Registered: Jan 22, 2009
Posts: 182
|
acorneau wrote: Adk wrote: I've seen this before but really never gave it any thought. How much cord might one need to make the purcell? I'm beginning to like my thoughts here. I want to say about 12' of 6mm cord will be just about right. If you want it longer, then maybe 13' or 14'. How long of a tether will this make when fully extended?
|
|
|
|
|
moose_droppings
May 8, 2009, 1:46 AM
Post #20 of 47
(61662 views)
Shortcut
Registered: Jun 7, 2005
Posts: 3371
|
d0nk3yk0n9 wrote: acorneau wrote: Adk wrote: I've seen this before but really never gave it any thought. How much cord might one need to make the purcell? I'm beginning to like my thoughts here. I want to say about 12' of 6mm cord will be just about right. If you want it longer, then maybe 13' or 14'. How long of a tether will this make when fully extended? The one on the right is made up of 12' of 6mm. It's a little under 2', and all the way extended it's a hair over 3'.
|
|
|
|
|
acorneau
May 8, 2009, 2:08 AM
Post #21 of 47
(61627 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
moose_droppings wrote: d0nk3yk0n9 wrote: How long of a tether will this make when fully extended? The one on the right is made up of 12' of 6mm. It's a little under 2', and all the way extended it's a hair over 3'. That sounds about right. Mine is about the same size as a 24" sling when shortened up and just at the end of my reach when fully extended.
|
|
|
|
|
alexoverhere
Jul 15, 2009, 8:00 AM
Post #22 of 47
(60528 views)
Shortcut
Registered: Nov 21, 2007
Posts: 57
|
My first climbing mentor showed me this system (girth hitched to harness tie-in points) and I've used it for about 5 years at rappel stations. However, I've always had a bunch of questions related to the purcell prusik that I could not find answers to. Some of these questions might seem completely retarded, so forgive me for them, and I do appreciate your responses. 1) The OP's link seems to indicate that some sliding of the prusik occurs during a fall. Is it correct that in a fall, the prusik will slide, thereby reducing the peak force of the fall? 2) What happens if you use a 2-wrap purcell prusik to clip into anchors instead of a 3-wrap? Or a different hitch? (I usually use a hedden hitch for many applications and have tried it instead of my purcell "prusik" too). I understand the hitch would slide at different amounts of force, but how does this affect the peak force the climber encounters? More generally, there is an optimal slipping coefficient that would minimize peak force for a specified cord diameter (e.g. 6mm) and specified maximal slipping length (e.g. 2ft) in a factor 1 or 2 fall? 3) Is it a bad idea to use 5.5mm tech cord as a purcell prusik, and why if so? Would it be bad because sliding/slippage could lead to material failure, or because peak forces would be higher because of the material, etc.? 4) I tie an overhand in my purcell prusik about 1.5 inches away from my harness tie-in point and clip my rappel device into the shelf created by the overhand, so that I can extend my rappel device away from me a bit (which makes it easier to clip backup prusik on my belay loop and onto the rope). Is this a bad idea for any reason? Specifically, does the purcell prusik become weaker to a point where I should be concerned? 5) Are there any hitches one can tie on a single line (instead of a loop of cord) that would be suitable for tying into rap anchors? For example, a tautline hitch (http://en.wikipedia.org/wiki/Taut-line_hitch), tied on two separate cords, each of which is tied off to the harness (***NO*** idea how much force that hitch or the others would hold). Having an adjustable tether is great, but if there was an clutter-minimal way to be clipped into two bolts, that would be even better. I realize that most people just girth hitch two slings (or worse, daisies) to their harness.. I would like something adjustable. And like someone else mentioned, clipping a carabiner to each of the two loops of the purcell prussik does not work well.
|
|
|
|
|
alexoverhere
Jul 15, 2009, 8:03 AM
Post #23 of 47
(60503 views)
Shortcut
Registered: Nov 21, 2007
Posts: 57
|
And I know this is been posted elsewhere, but I wanted to post it here so people could quickly grab a loop of cord or rope and tie a purcell prusik: http://www.pbase.com/phil_box/purcell_tie_in makes it so easy to tie one.
|
|
|
|
|
acorneau
Jul 15, 2009, 2:57 PM
Post #24 of 47
(60469 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
Hi Alex, I'll try to hit your points as best as I can.
alexoverhere wrote: 1) The OP's link seems to indicate that some sliding of the prusik occurs during a fall. Is it correct that in a fall, the prusik will slide, thereby reducing the peak force of the fall? That is my understanding. If you read the paper I referenced earlier in the thread you can see that all the Purcells slipped a certain amount.
In reply to: 2) What happens if you use a 2-wrap purcell prusik to clip into anchors instead of a 3-wrap? Just more friction: more wraps = more friction.
In reply to: I understand the hitch would slide at different amounts of force, but how does this affect the peak force the climber encounters? More generally, there is an optimal slipping coefficient that would minimize peak force for a specified cord diameter (e.g. 6mm) and specified maximal slipping length (e.g. 2ft) in a factor 1 or 2 fall? That's a pretty complex calculation, one that is beyond me. The problem is that every manufacturer's cord has a different sheath/surface so it would be hard to figure out.
In reply to: 3) Is it a bad idea to use 5.5mm tech cord as a purcell prusik, and why if so? Would it be bad because sliding/slippage could lead to material failure, or because peak forces would be higher because of the material, etc.? I would not use it for two reasons: 1. You want the semi-dynamic properties of standard nylon cord (reduces peak force). 2. Tech cord has much less friction so it may not hold on itself as well as standard nylon. (Recommended knot for Tech cord is a triple fisherman's.) BlueWater Ropes makes a dynamic accessory cord specifically for stuff like this: http://bluewaterropes.com/...Key=&ProdKey=134
In reply to: 4) I tie an overhand in my purcell prusik about 1.5 inches away from my harness tie-in point and clip my rappel device into the shelf created by the overhand, so that I can extend my rappel device away from me a bit (which makes it easier to clip backup prusik on my belay loop and onto the rope). Is this a bad idea for any reason? Specifically, does the purcell prusik become weaker to a point where I should be concerned? As you know any knot weakens the material, the question becomes does this knot weaken it to the point of concern... I've got PMI 6mm cord for mine. Breaking strength is 6.8kN single strand, so theoretically 13.6kN in a loop, 40% reduction for an overhand gives you 8.1kN (~1800 lbs.) You have to decide if that's "good enough" for you.
In reply to: 5) Are there any hitches one can tie on a single line (instead of a loop of cord) that would be suitable for tying into rap anchors? For example, a tautline hitch (http://en.wikipedia.org/wiki/Taut-line_hitch), tied on two separate cords, each of which is tied off to the harness (***NO*** idea how much force that hitch or the others would hold). I have experimented with a single-line Purcell idea, but I don't have any testing data to prove it's viability, so take it as you will. Take the end of your cord, make a bight and use the end to tie a barrel knot on itself, making something like a noose. Use that loop to tie a prussic back on itself. Once in place, work the slack out until the barrel knot is snug against the prussic hitch.
In reply to: Having an adjustable tether is great, but if there was an clutter-minimal way to be clipped into two bolts, that would be even better. I realize that most people just girth hitch two slings (or worse, daisies) to their harness.. I would like something adjustable. And like someone else mentioned, clipping a carabiner to each of the two loops of the purcell prussik does not work well. If you figure that one out let me know!
|
|
|
|
|
trenchdigger
Jul 15, 2009, 4:09 PM
Post #25 of 47
(57360 views)
Shortcut
Registered: Mar 9, 2003
Posts: 1447
|
acorneau wrote: In reply to: 5) Are there any hitches one can tie on a single line (instead of a loop of cord) that would be suitable for tying into rap anchors? For example, a tautline hitch (http://en.wikipedia.org/wiki/Taut-line_hitch), tied on two separate cords, each of which is tied off to the harness (***NO*** idea how much force that hitch or the others would hold). I have experimented with a single-line Purcell idea, but I don't have any testing data to prove it's viability, so take it as you will. Take the end of your cord, make a bight and use the end to tie a barrel knot on itself, making something like a noose. Use that loop to tie a prussic back on itself. Once in place, work the slack out until the barrel knot is snug against the prussic hitch. In reply to: Having an adjustable tether is great, but if there was an clutter-minimal way to be clipped into two bolts, that would be even better. I realize that most people just girth hitch two slings (or worse, daisies) to their harness.. I would like something adjustable. And like someone else mentioned, clipping a carabiner to each of the two loops of the purcell prussik does not work well. If you figure that one out let me know! I've experimented with something similar using a Blake's Hitch, but was unsatisfied with the security of it. One option is to take a short (~4ft) segment of 9mm cord and tie it to your tie-in points with a figure 8. Take a relatively short 5mm prusik and either girth hitch it to your harness or tie it into the 9mm cord retraced 8 (preferred), then tie it into a 3/2 prusik onto the 8mm cord. Finish it off with a carabiner tied to the end of the 9mm cord with a double overhand noose. This system gives more adjustability, but doesn't seem to store away as well as a basic purcell, so I've stuck with the purcell as the standard on my harness. I use a similar setup in a bag with 50' of cord (and a set of fours on the other end of the cord, stored in a pocket in the bag) for edge protection, etc. while doing tech rescue stuff. The setup was adapted from this http://www.rescueresponse.com/...df/aztek_for_rrg.pdf. Works great!
|
|
|
|
|
karcand
Jul 15, 2009, 4:20 PM
Post #26 of 47
(23738 views)
Shortcut
Registered: Jun 30, 2008
Posts: 30
|
I first saw this on a different forum and thought it was a really good idea. But after trying it out with a 6mm Purcell Prusik, I changed my mind. It worked great the first couple times, but during the third test the prusik slipped. When it slips fully extended, which is not terrible. But when I am in the field, I don't want to use something that only works 90% of the time. I was thinking though, if I got some 10mm static rope, could I use this method to set up a toprope anchor? This method if it works would be a great easy way to adjust the lengths and equalize the station.
|
|
|
|
|
knudenoggin
Jul 16, 2009, 3:30 AM
Post #27 of 47
(23708 views)
Shortcut
Registered: May 6, 2004
Posts: 596
|
acorneau wrote: In reply to: 3) Is it a bad idea to use 5.5mm tech cord as a purcell prusik, and why if so? Would it be bad because sliding/slippage could lead to material failure, or because peak forces would be higher because of the material, etc.? I would not use it for two reasons: 1. You want the semi-dynamic properties of standard nylon cord (reduces peak force). 2. Tech cord has much less friction so it may not hold on itself as well as standard nylon. (Recommended knot for Tech cord is a triple fisherman's.) I believe that this is mistaken re point #2: the slippage feared from the ends-joining knot is of the core shedding the sheath--slipping out! It is not the overall rope quitting the knot. So, with just that difference, the factor re friction-hitch gripping is not affected -- it's polyester on polyester (or is it nylon?), not Technora. BUT, I believe that the Tech Cord is stiffer, and that frustrates gripping also. In any case, for the first and likely other reasons, Tech Cord is probably better not used in this application. (Tom Moyer's site had a miscellaneous-items test report in which a Technora-cored cord slipped the core from a Grapevine knot.)
In reply to: 5) Are there any hitches one can tie on a single line (instead of a loop of cord) that would be suitable for tying into rap anchors? For example, a tautline hitch (http://en.wikipedia.org/wiki/Taut-line_hitch), tied on two separate cords, each of which is tied off to the harness (***NO*** idea how much force that hitch or the others would hold). The better friction hitch to use would be Blake's Hitch (which I like to name "ProhGrip" (or "ProhKlamp" might have a better Austrian flair), after Prohaska, who described it ages ago, a little prior to Blake. It is used by arborists to grip rope to itself (equal diameters); it is somewhat adjustable per cordage by (a) adding an extra turn on its end-nipping turns for stiff rope, or (b) adding an extra turn at the away end for slicker but flexible rope. It is more secure against coming untied than most others. One could use a hitch in each end as a means to ensure ultimate locking should slippage not abate. (But in some UK HSE (by Lyon Equip) testing, I think that this hitch exhibited very little slippage (vs. Prusik, Klemheist, and ... ?) -- 2001? report ) *kN*
|
|
|
|
|
trenchdigger
Jul 16, 2009, 3:58 AM
Post #28 of 47
(23697 views)
Shortcut
Registered: Mar 9, 2003
Posts: 1447
|
Here's an example of a potential personal anchor using a Blake's hitch. If the hitch fails, you don't die - always a plus! This example is tied with a section of old climbing rope. For use as a personal tether, I'd tie the figure-8 into my tie-in points.
(This post was edited by trenchdigger on Jul 16, 2009, 3:59 AM)
|
Attachments:
|
Blakestether.jpg
(126 KB)
|
|
|
|
|
knudenoggin
Jul 16, 2009, 7:24 PM
Post #29 of 47
(23670 views)
Shortcut
Registered: May 6, 2004
Posts: 596
|
Not only does Trenchdigger's structure use single rope, but it is constant in structure (or could be): whereas the PurcellP can be sometimes loading the hitch in either direction --with the knot effectively joining ends, or as forming an eye-knot feeding to the other end--, this single-rope structure constantly keeps the friction knot by the Fig.8 eyeknot connection to the harness and feeds adjustable length out to the Strangle-noose-hitched 'biner to clip to whatever. One constantly has single line, with a trio of knots in it under tension (and varying amounts of slack line in a loose loop, to beware of!). *kN* [edit for readability (yes, now I think it's readable :o)]
(This post was edited by knudenoggin on Jul 17, 2009, 2:55 AM)
|
|
|
|
|
trenchdigger
Jul 16, 2009, 7:37 PM
Post #30 of 47
(23630 views)
Shortcut
Registered: Mar 9, 2003
Posts: 1447
|
Yup, that about sums it up! The friction hitch staying in the same position, close to the harness is a definite plus, as is the greater adjustment in length than the purcell. It stores nicely when extended to about 1/3 length and clipping the slack loop into the carabiner.
|
|
|
|
|
acorneau
Jul 16, 2009, 7:47 PM
Post #31 of 47
(23660 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
Wow, I just had an idea... While I use my PP on a regular basis, I know that tying in with the climbing rope is the easiest/simplest/strongest/no-extra-gear-est way to tie in. The problem is you've only got one rope to use to tie in (excepting doubles/twins). So here's my idea: When tying in to the climbing rope, tie in with a good 4-5 feet of tail after your knot. This way when you get to a 2-bolt anchor you can clove hitch on one bolt as usual and then clove hitch/fig-8 into the other. Simple, no extra gear (save the second biner), elegant! The only exception I can think of is if you need every last inch of your rope to get to the anchors. While I have heard of this potential problem, I have never personally experienced it.
|
|
|
|
|
trenchdigger
Jul 16, 2009, 7:55 PM
Post #32 of 47
(23641 views)
Shortcut
Registered: Mar 9, 2003
Posts: 1447
|
acorneau wrote: Wow, I just had an idea... While I use my PP on a regular basis, I know that tying in with the climbing rope is the easiest/simplest/strongest/no-extra-gear-est way to tie in. The problem is you've only got one rope to use to tie in (excepting doubles/twins). So here's my idea: When tying in to the climbing rope, tie in with a good 4-5 feet of tail after your knot. This way when you get to a 2-bolt anchor you can clove hitch on one bolt as usual and then clove hitch/fig-8 into the other. Simple, no extra gear (save the second biner), elegant! The only exception I can think of is if you need every last inch of your rope to get to the anchors. While I have heard of this potential problem, I have never personally experienced it. Hmm interesting idea. I usually just tie a two-loop 8... I'm not sure I'd be a fan of that since I can't stand having a big tail in the way when I'm clipping. I almost always tuck the tail back into my figure-8.
|
|
|
|
|
tradrenn
Jul 18, 2009, 12:28 AM
Post #33 of 47
(23596 views)
Shortcut
Registered: Jan 16, 2005
Posts: 2990
|
trenchdigger wrote: acorneau wrote: Wow, I just had an idea... While I use my PP on a regular basis, I know that tying in with the climbing rope is the easiest/simplest/strongest/no-extra-gear-est way to tie in. The problem is you've only got one rope to use to tie in (excepting doubles/twins). So here's my idea: When tying in to the climbing rope, tie in with a good 4-5 feet of tail after your knot. This way when you get to a 2-bolt anchor you can clove hitch on one bolt as usual and then clove hitch/fig-8 into the other. Simple, no extra gear (save the second biner), elegant! The only exception I can think of is if you need every last inch of your rope to get to the anchors. While I have heard of this potential problem, I have never personally experienced it. Hmm interesting idea. I usually just tie a two-loop 8... I'm not sure I'd be a fan of that since I can't stand having a big tail in the way when I'm clipping. I almost always tuck the tail back into my figure-8. Adam, hopefully you are still in Squamish, I would love to talk to you about this staff some more. Acorneau`s idea can be improved some more, one could clove hitch a locking biner to the tail and clip it between legs to the chalk bag, that`s what my friend does with his PP, it works well, is out of the way and never bothers him while climbing. Acorneau thanks for this idea, I will try it this weekend, if I get to go climbing that is. V. Edit: This could be something real cool as you can clove hitch yourself to each bolt using just one hand.
(This post was edited by tradrenn on Jul 18, 2009, 12:44 AM)
|
|
|
|
|
bill413
Jul 18, 2009, 1:43 AM
Post #34 of 47
(23602 views)
Shortcut
Registered: Oct 19, 2004
Posts: 5674
|
I'm just having a hard time envisioning this vs. clove hitching the loop of rope between me & my belayer/last piece into the anchor.
|
|
|
|
|
acorneau
Jul 18, 2009, 2:09 PM
Post #35 of 47
(23530 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
bill413 wrote: I'm just having a hard time envisioning this vs. clove hitching the loop of rope between me & my belayer/last piece into the anchor. I'll try again: Tie in to the rope (i.e. fig-8) as usual except tie in so you have a 5 foot tail after your knot. When you arrive at a 2 bolt anchor, take that 5' tail and clove hitch that to the first bolt. Then pull up some slack from your lead line and clove hitch that to the second bolt. Ta da!
|
|
|
|
|
bill413
Jul 19, 2009, 1:38 AM
Post #36 of 47
(23483 views)
Shortcut
Registered: Oct 19, 2004
Posts: 5674
|
acorneau wrote: bill413 wrote: I'm just having a hard time envisioning this vs. clove hitching the loop of rope between me & my belayer/last piece into the anchor. I'll try again: Tie in to the rope (i.e. fig-8) as usual except tie in so you have a 5 foot tail after your knot. When you arrive at a 2 bolt anchor, take that 5' tail and clove hitch that to the first bolt. Then pull up some slack from your lead line and clove hitch that to the second bolt. Ta da! Ah - much clearer to me now. Thanks. So the advantage is "equalizing" the load on the two pieces.
|
|
|
|
|
shu2kill
Jul 19, 2009, 3:18 AM
Post #37 of 47
(23495 views)
Shortcut
Registered: Apr 9, 2008
Posts: 352
|
so now you are tied in to two points, without the need of extra gear. however, i have another question. you climb to the top of a multipitch route, and now you have to rappel down. how do you tie in to the anchors to pull the rope to set it at the rap station for the next pitch down?? or does this clove hitching thing only works in single pitch routes??
|
|
|
|
|
acorneau
Jul 19, 2009, 1:03 PM
Post #38 of 47
(23473 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
shu2kill wrote: so now you are tied in to two points, without the need of extra gear. however, i have another question. you climb to the top of a multipitch route, and now you have to rappel down. how do you tie in to the anchors to pull the rope to set it at the rap station for the next pitch down?? or does this clove hitching thing only works in single pitch routes?? Well, I only came up with this idea just yesterday so I hadn't thought through all scenarios. For raps I would use a separate system (Purcell, slings, etc).
|
|
|
|
|
bill413
Jul 19, 2009, 3:00 PM
Post #39 of 47
(23480 views)
Shortcut
Registered: Oct 19, 2004
Posts: 5674
|
acorneau wrote: shu2kill wrote: so now you are tied in to two points, without the need of extra gear. however, i have another question. you climb to the top of a multipitch route, and now you have to rappel down. how do you tie in to the anchors to pull the rope to set it at the rap station for the next pitch down?? or does this clove hitching thing only works in single pitch routes?? Well, I only came up with this idea just yesterday so I hadn't thought through all scenarios. For raps I would use a separate system (Purcell, slings, etc). Let's see - I'm a bit foggy on the previous discussion on this thread, so I don't remember the constraints on our situation, but... With minimal extra gear, bolted anchor: Tie into system as acorneau has suggested. Pull up rope so you now have both ends. end of rope through chains. Pull both ends of rope through your hands so that you wind up with the middle point of the rope hanging through the chains. Rig your rappel device. Double check the rigging of your rappel device. Untie one the clove hitches from the chains. Check your rappel device. Untie the 5 foot tail. Rap down (you can keep the end of the rope still tied to you while doing this). Tie into next anchor. Repeat. Sigh - I'll try to bring up some extra gear with me next time...It'll make it easier.
(This post was edited by bill413 on Jul 19, 2009, 6:11 PM)
|
|
|
|
|
shu2kill
Jul 19, 2009, 3:35 PM
Post #40 of 47
(23439 views)
Shortcut
Registered: Apr 9, 2008
Posts: 352
|
what i usually do, and i think many people do as well, is use a PAS and a clove hitch on the rope to tie myself to the chains when going up. but i also bring my purcell prussik, so when im going to rap, i use the prussik and the PAS. i found the purcell prussik is very helpful for rappeling, because you can rig the rappel device, release the PAS from the chains, and then you just need to adjust the lenght of the purcell prussik until the decive loads, unloading the prussik...
|
|
|
|
|
tradrenn
Jul 19, 2009, 5:41 PM
Post #41 of 47
(23436 views)
Shortcut
Registered: Jan 16, 2005
Posts: 2990
|
shu2kill wrote: does this clove hitching thing only works in single pitch routes?? Best situation for this idea to work would be leading multipitch route were you are leading every second pitch.
|
|
|
|
|
alexoverhere
Jul 23, 2009, 10:34 PM
Post #42 of 47
(23302 views)
Shortcut
Registered: Nov 21, 2007
Posts: 57
|
thanks acorneau, trenchdigger, and everyone else for your comments. i like girth hitching the PP to the harness because it allows you to easily remove it, flip it around, tie a prussik on the rope, and then either 1) clip the other end into your belay loop (just like majid's pictures show) for a waist prussik or 2) use it as a foot loop for ascending. come to think of it, perhaps the potential to ascend with the purcell prusik is reason enough to not use tech cord (which doesn't work well as a friction hitch on rope) or a single-cord adjustable tether...
|
|
|
|
|
alexoverhere
Jul 23, 2009, 10:53 PM
Post #43 of 47
(23327 views)
Shortcut
Registered: Nov 21, 2007
Posts: 57
|
the extra figure-8 tail tether idea for 2 bolts is interesting, but is this for belaying or setting up to rapel? in either case, if i understand you correctly, your primary goal is to save gear. if so, why not do one of the following? 1) clove hitch to Bolt A. clove hitch to Bolt B. (obviously this unequalized). 2) clip a draw to each bolt. assume they're both in reach. clove hitch to Draw A and run the rope back down to you. clove to an HMS locker on your belay loop. run the rope back up to the Draw B and clove. now you have redundancy and pre-equalization. (if Draw A but not Draw B is out of reach from your stance, clip the rope to it but don't clove off in the first step. if both draws are out of reach, clip into Draw A, the HMS, and Draw B, and then once at your stance, clove hitch twice at your HMS.) Personally, for belay anchors, i almost always equalize the pieces with a sling (sliding X / figure-8 / equallette power point) or draws and clove hitch to a locker on the power point. I suppose 2) would be useful if there was a large tree or horn that a sling wouldn't fit around. For rappeling, i use my purcell prusik at a power point, unless it's awkward/too long, in which case i'll directly clip into one anchor point with my purcell prusik and to another with a sling or draws or whatever i have sitting around. i'd always want to have my prusik as an extra cordelette / for ascending anyway, so i don't consider it extra gear.
|
|
|
|
|
acorneau
Jul 24, 2009, 12:22 AM
Post #44 of 47
(23340 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
alexoverhere wrote: the extra figure-8 tail tether idea for 2 bolts is interesting, but is this for belaying or setting up to rapel? The thought came to me thinking about climbing. It wouldn't be so convenient while rapping. You bring up a few other possibilities which I'm sure are viable, and quite possibly preferable, in some circumstances. My belief is to know as many techniques as possible so you can choose the most appropriate for the circumstances.
|
|
|
|
|
ml_nelson
Nov 19, 2013, 12:26 AM
Post #45 of 47
(17654 views)
Shortcut
Registered: Apr 12, 2010
Posts: 16
|
I have my own variation on the Prucell. My desire was to incorporate a loop to rappel from. The top left loop is to clip into an anchor. The small cord, a klemheist (but Prusik works too), is to adjust the length of the lanyard. The loop with the black plastic protector is where I clip to my harness. Note that the small Klemheist cord is wrapped around the orange cord a few times under the black plastic. This guarantees that when clipping to this loop, you have clipped both the orange cord and the small Klemheist cord. (the black plastic also makes it easy to identify what loop goes onto the harness) Lastly, there is a short loop for rappelling off of. I sized it to my preference for a short, extended-rappel. The big knot is a figure-8 with 3 passes of cord in it. (Note that the bottom end of the figure-8 has only 2 cords used for the loop, so the third cord is tied in a small stopper knot) Thoughts?
|
Attachments:
|
Prucell-2.jpg
(108 KB)
|
|
|
|
|
majid_sabet
Nov 19, 2013, 4:02 AM
Post #46 of 47
(17643 views)
Shortcut
Registered: Dec 13, 2002
Posts: 8390
|
ml_nelson wrote: I have my own variation on the Prucell. My desire was to incorporate a loop to rappel from. The top left loop is to clip into an anchor. The small cord, a klemheist (but Prusik works too), is to adjust the length of the lanyard. The loop with the black plastic protector is where I clip to my harness. Note that the small Klemheist cord is wrapped around the orange cord a few times under the black plastic. This guarantees that when clipping to this loop, you have clipped both the orange cord and the small Klemheist cord. (the black plastic also makes it easy to identify what loop goes onto the harness) Lastly, there is a short loop for rappelling off of. I sized it to my preference for a short, extended-rappel. The big knot is a figure-8 with 3 passes of cord in it. (Note that the bottom end of the figure-8 has only 2 cords used for the loop, so the third cord is tied in a small stopper knot) Thoughts? what size cord is used on your prusik?
|
|
|
|
|
ml_nelson
Nov 19, 2013, 4:20 AM
Post #47 of 47
(17633 views)
Shortcut
Registered: Apr 12, 2010
Posts: 16
|
The small cord is about 6mm, the large orange is about 9mm.
|
|
|
|
|
|