|
crackboy
Mar 8, 2006, 11:26 PM
Post #1 of 5
(1369 views)
Shortcut
Registered: Jun 14, 2003
Posts: 323
|
Question for you all. i was wondering if you can get by with a 50m hauline on any of the cloumn routes. my gym rope is a 9.6 50m and i figure that would be a nice width and could funtion as a back up lead line, but its length has me doubting it. thanks
|
|
|
|
|
hollyclimber
Mar 8, 2006, 11:37 PM
Post #2 of 5
(1369 views)
Shortcut
Registered: Apr 27, 2002
Posts: 124
|
I think its a bad idea. I can't say that I have ever tried to climb a column route with a 50 m rope, but if you did it, you would for sure say that you are never going to do it again. I think I climbed Zodiac one time with a short haul rope and it was a pain in the ass. hgb
|
|
|
|
|
halfacre
Mar 8, 2006, 11:50 PM
Post #3 of 5
(1369 views)
Shortcut
Registered: May 21, 2004
Posts: 3
|
You will want a 60 meter line on the Prow. Pitches 2 & 3 link with a 60 as do pitches 7 & 8. On pitch 10 you want a 60 so you can reach the plush ledge. Otherwise you have to build your own anchor in a chimney.
|
|
|
|
|
crackboy
Mar 9, 2006, 8:10 PM
Post #4 of 5
(1369 views)
Shortcut
Registered: Jun 14, 2003
Posts: 323
|
yea i was just curious since i didn't know pitch lengths. thanks turns out a friend of mine is sending me his 10.2 60m static, so i will have a haul line. so it is less of a big deal
|
|
|
|
|
apollodorus
Mar 10, 2006, 1:32 AM
Post #5 of 5
(1369 views)
Shortcut
Registered: Feb 18, 2002
Posts: 2157
|
Use the static line for hauling. You'll spend less energy stretching the rope, and more energy scraping the bag up the wall. You shouldn't use a lead rope for hauling, and then expect to still be a lead rope. A dynamic rope gets permanently stretched during falls and when cranking a haul bag past obstructions. Hauling usually also abrades the rope. If you need a back-up lead line, carry it coiled up or in a bag. Using the rope to fix a pitch above the bivy is also really nice.
|
|
|
|
|
|