|
dagibbs
Jul 8, 2012, 1:22 AM
Post #2 of 8
(4522 views)
Shortcut
Registered: Oct 1, 2007
Posts: 921
|
That's quite the climb.
|
|
|
|
|
USnavy
Jul 8, 2012, 2:41 AM
Post #3 of 8
(4514 views)
Shortcut
Registered: Nov 6, 2007
Posts: 2667
|
Insane, it looks like you need a 100m rope to lower off of that thing.
|
|
|
|
|
dagibbs
Jul 8, 2012, 10:20 PM
Post #4 of 8
(4427 views)
Shortcut
Registered: Oct 1, 2007
Posts: 921
|
USnavy wrote: Insane, it looks like you need a 100m rope to lower off of that thing. It does look bloody long, doesn't it? But, part way through the video, isn't there a stored/coiled rope part way up the cliff? Maybe that is for finishing the descent?
(This post was edited by dagibbs on Jul 8, 2012, 10:21 PM)
|
|
|
|
|
trilobitepro
Jul 9, 2012, 11:58 PM
Post #5 of 8
(4354 views)
Shortcut
Registered: Jun 25, 2012
Posts: 4
|
Hi, the route have 45 metres aprox, and the rope has 80 m, this is the reason to downclimb to the last bolt. The rope is not enough and also itīs necesary that the person who belay, climb to the firts bolt because the ground is not level. There is a difference in height between the belayer and the climber when he landed. If anybody wants to climb the route, use a rope more longer than 80m :P but if you have a 80m rope, you donīt have any problem to climb it, because we donīt have it. regards
|
|
|
|
|
dagibbs
Jul 10, 2012, 2:35 AM
Post #6 of 8
(4339 views)
Shortcut
Registered: Oct 1, 2007
Posts: 921
|
I'm not sure he down-climbed to the last bolt, so much as "jumped off" and took the whipper. But same effect. :) And, it did look like pretty easy going up to the first bolt -- I could see the belayer climbing up that, then down-climbing it.
|
|
|
|
|
Traches
Jul 12, 2012, 9:32 PM
Post #7 of 8
(4221 views)
Shortcut
Registered: Jan 26, 2012
Posts: 83
|
Victory whipper!!
(This post was edited by Traches on Jul 12, 2012, 9:33 PM)
|
|
|
|
|
potreroed
Jul 12, 2012, 10:06 PM
Post #8 of 8
(4210 views)
Shortcut
Registered: Sep 30, 2001
Posts: 1454
|
Very inspiring, thank you.
|
|
|
|
|
|