 |

jonathan.gaillard
May 18, 2010, 9:52 PM
Post #1 of 28
(9973 views)
Shortcut
Registered: Nov 10, 2009
Posts: 96
|
Does anyone here (that is good at picking a piece the first time) rack all their pro on one biner each? I'm somewhat new to the trad game and was thinking about changing things up now that I am a little better at picking gear. How about taking nuts and putting a quicklink on the wire, with a flexible dogbone and biner, making them similiar to racked cams (that have their own biners). Then hexes on webbing just need a biner. So everything is grab and plug and if needed extension you could grab slings that are perhaps twist racked on one biner each? Does that sound reasonable for quick climbing and with minimal motions and not to heavy? I figure the added biners on the nuts is offset by not carrying two binered draws.
|
|
|
 |
 |

patto
May 18, 2010, 10:04 PM
Post #2 of 28
(9952 views)
Shortcut
Registered: Nov 15, 2005
Posts: 1453
|
No. That would require too much gear and too much weight. Far too unecessary. I carry 30 nuts when I climb. I would hate to use your suggested method. *double set of nuts 1-10 DMM, WC *6 Peenuts *4 RPs (proper RPs)
|
|
|
 |
 |

karmiclimber
May 18, 2010, 10:07 PM
Post #3 of 28
(9942 views)
Shortcut
Registered: Mar 11, 2004
Posts: 1058
|
patto wrote: No. That would require too much gear and too much weight. Far too unecessary. I carry 30 nuts when I climb. I would hate to use your suggested method. *double set of nuts 1-10 DMM, WC *6 Peenuts *4 RPs (proper RPs) LOL. I am picturing him going into REI and saying "Could I please have 100 biners? Yes, 100. Thank you." J/K. I rack everything from smallest to biggest. So, I put all my micro stoppers from smallest to biggest on one biner. Cams, smallest to biggest, two to a biner, unless I have doubles, then the doubles go on the same biner. Etc. Etc. So, I don't have to think about it too much when I get up there.
|
|
|
 |
 |

granite_grrl
May 18, 2010, 10:09 PM
Post #4 of 28
(9938 views)
Shortcut
Registered: Oct 25, 2002
Posts: 15084
|
This is actually going to make it much worse when trying to figure out what size nut you want for a placement. You're more than welcome to try it of course, but I'm just saying that there's a reason that you never see anyone doing this.
|
|
|
 |
 |

kennoyce
May 18, 2010, 10:13 PM
Post #5 of 28
(9921 views)
Shortcut
Registered: Mar 6, 2001
Posts: 1338
|
That would be retarded. you wouldn't be able to fit that many biners on your gear loops and I don't think anyone would want to carry a gear sling just for nuts. If I'm carrying 2 sets of nuts up one climb, that doesn't mean I'll carry 20 draws (one for each nut) because i'm not going to place every nut i'm carrying. So in answer to your question: no, that doesn't sound reasonable for quick climbing and with minimal motions and not to heavy (wow that sentence sucks).
|
|
|
 |
 |

csproul
May 18, 2010, 10:23 PM
Post #6 of 28
(9908 views)
Shortcut
Registered: Jun 4, 2004
Posts: 1769
|
As a general rule, no. I carry 2 or 3 biners with all my nuts. However, I have been known to pre-rack a key nut on a draw for a redpoint attempt. That way I can quickly grab it, place it, and clip it. I did this just this last weekend for my hardest trad redpoint.
|
|
|
 |
 |

adatesman
May 18, 2010, 11:08 PM
Post #7 of 28
(9858 views)
Shortcut
Registered: Jul 13, 2005
Posts: 3479
|
|
|
|
 |
 |

markcarlson
May 18, 2010, 11:30 PM
Post #8 of 28
(9832 views)
Shortcut
Registered: Feb 14, 2009
Posts: 123
|
jonathan.gaillard wrote: Does anyone here (that is good at picking a piece the first time) rack all their pro on one biner each? I suppose I would if I just did a pitch but took/fell, got to the top, lowered/rapped, and wanted to try to do the pitch again clean. That is assuming I did not want to change any of the pro placed on the last attempt.
|
|
|
 |
 |

bill413
May 19, 2010, 2:22 AM
Post #9 of 28
(9764 views)
Shortcut
Registered: Oct 19, 2004
Posts: 5674
|
jonathan.gaillard wrote: Does anyone here (that is good at picking a piece the first time) rack all their pro on one biner each? I'm somewhat new to the trad game and was thinking about changing things up now that I am a little better at picking gear. How about taking nuts and putting a quicklink on the wire, with a flexible dogbone and biner, making them similiar to racked cams (that have their own biners). Then hexes on webbing just need a biner. So everything is grab and plug and if needed extension you could grab slings that are perhaps twist racked on one biner each? Does that sound reasonable for quick climbing and with minimal motions and not to heavy? I figure the added biners on the nuts is offset by not carrying two binered draws. It turns out that a lot of the bulk my rack is the biners. I recently climbed with a friends rack where he had multiple cams per biner, and it was much svelter than mine...I'm not convinced about it though. We both have multiple nuts on a single biner. If you knew exactly which pieces you were going to plug where, and were going for a lightweight attempt, then preracking one per draw would make sense. But, for normal climbing, as others have said, it would make your rack too bulky, heavy, and not help that much in terms of "fumble factor." But - try & see. Just don't invest in it until you do.
|
|
|
 |
 |

jonathan.gaillard
May 19, 2010, 3:43 AM
Post #10 of 28
(9721 views)
Shortcut
Registered: Nov 10, 2009
Posts: 96
|
Ok, I am convinced, you guys make some good points. Some of you though need to relax and stop pouncing on people geesus. It was just a thought.
|
|
|
 |
 |

majid_sabet
May 19, 2010, 3:54 AM
Post #11 of 28
(9707 views)
Shortcut
Registered: Dec 13, 2002
Posts: 8390
|
karmiclimber wrote: patto wrote: No. That would require too much gear and too much weight. Far too unecessary. I carry 30 nuts when I climb. I would hate to use your suggested method. *double set of nuts 1-10 DMM, WC *6 Peenuts *4 RPs (proper RPs) LOL. I am picturing him going into REI and saying "Could I please have 100 biners? Yes, 100. Thank you." J/K. I rack everything from smallest to biggest. So, I put all my micro stoppers from smallest to biggest on one biner. Cams, smallest to biggest, two to a biner, unless I have doubles, then the doubles go on the same biner. Etc. Etc. So, I don't have to think about it too much when I get up there. I got like 200+ biner in my climbing room so what does that mean ?
|
|
|
 |
 |

shimanilami
May 19, 2010, 5:39 AM
Post #12 of 28
(9645 views)
Shortcut
Registered: Jul 24, 2006
Posts: 2043
|
majid_sabet wrote: I got like 200+ biner in my climbing room so what does that mean ? You have a climbing room?! Is it padded?
|
|
|
 |
 |

guangzhou
May 19, 2010, 5:40 AM
Post #13 of 28
(9644 views)
Shortcut
Registered: Sep 27, 2004
Posts: 3389
|
I carry a set and half of nuts on a binner. One side has a set and half of Wild Country Rocks, the other Side has a set and half of DMM Walnuts. I have done a few single pitch routes where I tried to figure out what piece i needed before living the ground and put a nut/draw together for sequential move.
|
|
|
 |
 |

karmiclimber
May 19, 2010, 9:52 AM
Post #14 of 28
(9604 views)
Shortcut
Registered: Mar 11, 2004
Posts: 1058
|
majid_sabet wrote: karmiclimber wrote: patto wrote: No. That would require too much gear and too much weight. Far too unecessary. I carry 30 nuts when I climb. I would hate to use your suggested method. *double set of nuts 1-10 DMM, WC *6 Peenuts *4 RPs (proper RPs) LOL. I am picturing him going into REI and saying "Could I please have 100 biners? Yes, 100. Thank you." J/K. I rack everything from smallest to biggest. So, I put all my micro stoppers from smallest to biggest on one biner. Cams, smallest to biggest, two to a biner, unless I have doubles, then the doubles go on the same biner. Etc. Etc. So, I don't have to think about it too much when I get up there. I got like 200+ biner in my climbing room so what does that mean ? That you have a serious jones for biners?
|
|
|
 |
 |

welle
May 19, 2010, 4:08 PM
Post #15 of 28
(9503 views)
Shortcut
Registered: Aug 8, 2008
Posts: 212
|
Jonathan, what most climbers do is divide the set of nuts into two or three - bigger pieces on one biner and smaller pieces on another. This way you reduce the risk of losing all your stoppers if you accidentally drop them and makes fiddling with different sizes easier. Plus if you can see the climb from the ground, you can choose to leave either set on the ground to reduce weight. Also, racking the stoppers on ovals is super-handy.
|
|
|
 |
 |

summerprophet
May 19, 2010, 5:01 PM
Post #16 of 28
(9457 views)
Shortcut
Registered: Jan 17, 2004
Posts: 764
|
majid_sabet wrote: I got like 200+ biner in my climbing room so what does that mean ? Means you have a hoarding problem.
|
|
|
 |
 |

shoo
May 19, 2010, 5:24 PM
Post #17 of 28
(9431 views)
Shortcut
Registered: Dec 22, 2006
Posts: 1501
|
jonathan.gaillard wrote: How about taking nuts and putting a quicklink on the wire, with a flexible dogbone and biner, making them similiar to racked cams (that have their own biners). Then hexes on webbing just need a biner. So everything is grab and plug and if needed extension you could grab slings that are perhaps twist racked on one biner each? God I want someone to try this.
|
|
|
 |
 |

swoopee
May 19, 2010, 6:16 PM
Post #18 of 28
(9379 views)
Shortcut
Registered: Nov 17, 2008
Posts: 560
|
Forget the harness. I'm going back to using a bowline on a coil and Goldline rope.
|
|
|
 |
 |

willwill
May 20, 2010, 11:55 PM
Post #19 of 28
(9237 views)
Shortcut
Registered: May 30, 2009
Posts: 31
|
Shouldn't your topic be one biner per nut, or do you intend to buy nuts until you can have one one every biner on your rack?
|
|
|
 |
 |

milesenoell
May 21, 2010, 12:45 AM
Post #20 of 28
(9204 views)
Shortcut
Registered: Sep 19, 2006
Posts: 1156
|
jonathan.gaillard wrote: How about taking nuts and putting a quicklink on the wire, with a flexible dogbone and biner, making them similiar to racked cams (that have their own biners). Then hexes on webbing just need a biner. So everything is grab and plug and if needed extension you could grab slings that are perhaps twist racked on one biner each? I think you should totally try it out. Nobody here has done it, and while it isn't likely to be something you keep doing, it should be humorous for those watching.
|
|
|
 |
 |

acorneau
May 21, 2010, 12:56 AM
Post #21 of 28
(9197 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
jonathan.gaillard wrote: How about taking nuts and putting a quicklink on the wire, with a flexible dogbone and biner, making them similiar to racked cams (that have their own biners). I know every one else has beaten you up about everything else in your post, but I've got to respond to this part (for some reason?!?). Peguet, the maker of Mallion Rapide-brand quicklinks, makes a Zink/aluminum alloy quicklink (they call "Zicral") in two sizes. 7mm, which has a breaking load of ~12kN and weighs a scant 18 grams (less than a CAMP Nano!); and a 10mm which has a BL of ~24kN at almost 49 grams (about the weight of a bigger non-locker). Most nuts have a strength rating of 10-12kN and most placements in rock will only hold ~10kN max anyway, so let's go for the 7mm quicklinks. 14 quicklinks (for 14 nuts) with 7mm quicklinks = 8.8 oz. 14 Nano biners (@23 grams each) = 11.3 oz. Two and a half ounces saved. I say go for it!
|
|
|
 |
 |

desertwanderer81
May 21, 2010, 10:28 PM
Post #22 of 28
(9082 views)
Shortcut
Registered: Sep 5, 2007
Posts: 2272
|
jonathan.gaillard wrote: Does anyone here (that is good at picking a piece the first time) rack all their pro on one biner each? I'm somewhat new to the trad game and was thinking about changing things up now that I am a little better at picking gear. How about taking nuts and putting a quicklink on the wire, with a flexible dogbone and biner, making them similiar to racked cams (that have their own biners). Then hexes on webbing just need a biner. So everything is grab and plug and if needed extension you could grab slings that are perhaps twist racked on one biner each? Does that sound reasonable for quick climbing and with minimal motions and not to heavy? I figure the added biners on the nuts is offset by not carrying two binered draws. Most Biners I know typically have 2 nuts each or no nuts at all. Then again, most whom I know don't like to be called Biners.
|
|
|
 |
 |

redlude97
May 21, 2010, 10:57 PM
Post #23 of 28
(9066 views)
Shortcut
Registered: Aug 27, 2008
Posts: 990
|
desertwanderer81 wrote: jonathan.gaillard wrote: Does anyone here (that is good at picking a piece the first time) rack all their pro on one biner each? I'm somewhat new to the trad game and was thinking about changing things up now that I am a little better at picking gear. How about taking nuts and putting a quicklink on the wire, with a flexible dogbone and biner, making them similiar to racked cams (that have their own biners). Then hexes on webbing just need a biner. So everything is grab and plug and if needed extension you could grab slings that are perhaps twist racked on one biner each? Does that sound reasonable for quick climbing and with minimal motions and not to heavy? I figure the added biners on the nuts is offset by not carrying two binered draws. Most Biners I know typically have 2 nuts each or no nuts at all. Then again, most whom I know don't like to be called Biners. Those would be beaners
|
|
|
 |
 |

acorneau
May 21, 2010, 11:27 PM
Post #24 of 28
(9047 views)
Shortcut
Registered: Feb 6, 2008
Posts: 2889
|
desertwanderer81 wrote: Most Biners I know typically have 2 nuts each or no nuts at all. Then again, most whom I know don't like to be called Biners. Humor fail.
|
|
|
 |
 |

USnavy
May 22, 2010, 8:24 AM
Post #25 of 28
(9003 views)
Shortcut
Registered: Nov 6, 2007
Posts: 2667
|
Hell no, I put one set of nuts on a big carabiner. I carry extra biners to clip the nuts to if I am doing aid or if I am free climbing, I use draws.
|
|
|
 |
|
|